STUDYSHIELDS ASSIGNMENT HELP

  • Home
  • Blog
  • Courses
    • Child Category 1
    • Child Category 2
    • Child Category 3
    • Child Category 4
  • Services
  • Country
    • Childcare
    • Doctors
  • Home
  • Blog
  • Sample Works
  • Order Now

Tuesday, March 2, 2021

The Recovery Plan Project Case

 March 02, 2021     No comments   

 1) First part: The Recovery Plan Project Case


For this assignment, you will document the conceptual steps taken in the project described in the Portfolio Project Option 1, which you can access in the Module 8 folder. Note: This milestone builds upon those milestones completed previously.


Document the following in a paper:


Identify and describe the risk quantification methods      based on the PMBOK Guide - Sixth Edition

Describe and assess qualitative risk assessment      measures taken in the project as described in the case study

Describe and apprise the steps taken in risk      assessment and quantification (as outlined in the case study)

Submission:


Include one current (no older than five years)      scholarly source that is not a required or recommended reading for this      course. This should be a source you plan to use in your final paper. 

Provide a minimum of a three page narrative by      dedicating about a page to each of the three bullet points listed above.

Format your paper according to APA format.

2) second part: The Final Project:  The Recovery Plan Project


Read the Recovery Plan project:


Van Wyk, Bowen, Akintoye. (2008). Project risk management practice: The case of a South African utility company (Links to an external site.). International Journal of Project Management, 26(2), 149-163.


Examine      the project management issues detailed in the case, including those      concerning procurement, contracts, and risk management.

In no      more than one page, give an overview of the case and the project      management issues to be covered in more detail.

Discuss,      in logical order, the following topics: (Note: You must determine the      logical order of these topics; this is part of your grade. See the grading      rubric in this week's folder.)

Risk       identification

Risk       assessment and prioritization

Risk       response for prevention

Mitigation       or contingent actions

The       fundamental conceptual steps used to respond to project risks

The       strengths and weaknesses of the project risk management practices

In an      appendix, identify the risks and categorize each one. (This categorization      is left to you; however, you might include external risks, such as      regulatory and currency changes, or technical risks, such as complexity or      design.) You must discuss the appendix in the body of your paper. In other      words, do not simply say "see appendix," but rather explain what      the appendix covers.

Discuss      the prioritization of the risks identified, their severity, and the      management response strategies

Submission:


Write      a paper addressing the Recovery Plan project. Your paper should be full 10      pages in length, not including the required title and references pages and      the appendix.

Support      your paper with a minimum of three to four current scholarly sources from      the Library (no older than five years). This is in addition to any course      textbooks or lecture material you decide to use. Of course, you may always      exceed the minimum number of sources.

Assess      and critique the risk response strategies used and identify a minimum of      three new recommended risk response strategies in response to the risks      identified.

Format      your entire paper according to the APA format.

Pages 36, 37, 54, 55, 93, & 215 in Mastering Risk and Procurement


Noakes-Fry, K. (2016). Part II: Contracting for a resilient supply train. In K. Noakes-Fry (Ed.), Creating and Maintaining Resilient Supply Chains (64-101). Brookfield, CT: Rothstein Publishing.


Vereen, S. C., Sinacori, B., & Back, W. E. (2016). Critical risk considerations for cost estimating on international construction projects. International Journal of Construction Project Management, 8(2), 153-169.


Yamin, M., & Sim, A. K. S. (2016). Critical success factors for international development projects in Maldives: Project teams’ perspective. International Journal of Managing Projects in Business, 99(3), 481-504.


Das, A. (2013, October 29). Anti-dumping agreement: Overview. Centre for WTO Studies. UNESACP – ITC Technical Capacity Building Workshop on Afghanistan’s Accession to WTO. Retrieved from http://www.unescap.org/sites/default/files/Third%20Technical%20Workshop%20on%20Afghanistan%27s%20Accession%20to%20the%20World%20Trade%20Agreement%20-%20WTO%20Agreement%20on%20Anti-dumping%20by%20Prof.%20Abhijit%20Das.pdf


Dodge, W. S. (2015, December). International comity in American law. Columbia Law Review, 15(8), 2071-2141.


International Contract Law and Administration. (2013). In M. H. Ferrara (Ed.). Gale Business Insights Handbook of Global Business Law (pp. 191-200). Retrieved from http://link.galegroup.com/apps/doc/CX2759300026/GVRL?u=coloradosu&sid=GVRL&xid=894ebbd0.


International Trade Administration. (2016a). Cash in advance. Retrieved from https://www.export.gov/article?id=Cash-in-Advance


International Trade Administration. (2016b). Letters of credit. Retrieved from https://www.export.gov/article?id=Letters-of-Credit-and-Documentary-Collection


Joshi, A. S., & Neumann, G. (2012, May 8). A primer for Alien Tort Claims Act. Retrieved from http://apps.americanbar.org/litigation/committees/businesstorts/articles/spring2012-0512-primer-alien-tort-claims-act.html


Kerzner, H. R. (2013). Project management: A systems approach to planning, scheduling, and controlling (11th ed.). Wiley: New York.


Lenaghan, J. M. (2018). Tort liability of school districts, officers, and employees. Retrieved from https://eric.ed.gov/?id=ED088234


Struett, M. J., (2016). American governance. In S. Schechter, T. S. Vontz, T. A. Birkland, M. A. Graber, & J. J. Patrick (Eds.), Vol. 3. Farmington Hills, MI: Macmillan Reference USA.


U.S. Census Bureau. (2018). Guide to foreign trade statistics. Retrieved from https://www.census.gov/foreign-trade/guide/sec2.html


U.S. Department of Justice. (2018). Foreign Corrupt Practices Act. Retrieved from https://www.justice.gov/criminal-fraud/foreign-corrupt-practices-act


  • Share This:  
  •  Facebook
  •  Twitter
  •  Google+
  •  Stumble
  •  Digg
Email ThisBlogThis!Share to XShare to Facebook
Newer Post Older Post Home

0 comments:

Post a Comment

Click Here to Place order

Popular Posts

  • A “criminal minds” Aileen Wournos individual will be your “patient”
     A “criminal minds” Aileen Wournos individual will be your “patient”  A brief history of the patient including diagnoses (documented or your...
  • CEO Jane Lionel has some hard decisions to make with regard to some of the company’
     CEO Jane Lionel has some hard decisions to make with regard to some of the company’solder hands, and even on the eve of that decision, I be...
  • Problem in Supply Chain
    Problem in Supply Chain Problem 2. (Chapter 11: The Storage and Handling System) Compare the constrast private ownership of storage space to...

Recent Posts

Unordered List

Pages

  • Home

Text Widget

Blog Archive

  • November 2022 (20)
  • October 2022 (50)
  • September 2022 (119)
  • August 2022 (107)
  • February 2022 (501)
  • January 2022 (443)
  • December 2021 (488)
  • November 2021 (1574)
  • October 2021 (28)
  • September 2021 (11)
  • July 2021 (8)
  • June 2021 (15)
  • May 2021 (39)
  • April 2021 (15)
  • March 2021 (303)
  • February 2021 (712)
  • January 2021 (903)
  • December 2020 (2)
  • September 2020 (33)
  • April 2016 (5183)
  • March 2016 (3763)
  • February 2016 (4356)
  • January 2016 (1749)
  • December 2015 (22)
  • November 2015 (147)
  • October 2015 (23)

Sample Text

Copyright © STUDYSHIELDS ASSIGNMENT HELP | Powered by Blogger
Design by Hardeep Asrani | Blogger Theme by NewBloggerThemes.com | Distributed By Gooyaabi Templates