STUDYSHIELDS ASSIGNMENT HELP

  • Home
  • Blog
  • Courses
    • Child Category 1
    • Child Category 2
    • Child Category 3
    • Child Category 4
  • Services
  • Country
    • Childcare
    • Doctors
  • Home
  • Blog
  • Sample Works
  • Order Now

Thursday, March 31, 2016

SCENARIO # 2: Serious Near-Miss Crane Incident

 March 31, 2016     No comments   

SCENARIO # 2: Serious Near-Miss Crane Incident
The Situation: You are the EH&S professional at your company's shipyard. You have just received a call from a production supervisor that there has been a very serious near miss accident out in the assembly area. Your company is manufacturing the second Littoral Combat Ship (LCS) for the US Navy. This new generation high speed, trimaran design warship has been designed to carry out a wide range of tactical, combat, and support operations in the near-shore  (littoral) environment. The project is severally over budget and has received a considerable amount of criticism for it. Successful completion of the project at this phase will be a prime determinant in your companies securing the very lucrative follow-up contracts for more LCS's. Everyone in the shipyard feels the pressure to complete this project ASAP.
Apparently a very large 20 ton overhead crane had some cables snap and has partially collapsed while trying to hoist a large section of the vessel into place for its final welding operation. When you arrive on scene, you see the section wedged overhead between some support beams and walkways. About a dozen hourly workers are scattered about as they leaped to safety after hearing the cables snap. There are many bumps, bruises and scratches on the workers, but they all are able to be treated internally at your nurse's office. In this initial assessment, there appears to be no need for, or request on the part of the employees, to go to any outside medical consultant or hospital emergency room.
Almost immediately you can hear the men complaining that the first attempt to lift the unit did not work and then the production engineer's decided to “jury rig” some extra cables to lift the unit in place. In addition, one individual said that they were trying to hoist about 28-30 tons, and that was just too much for the old crane. Another offered that the cables themselves had not been changed out in a couple of years and that was against OSHA regulations. Everyone said that they could hear the unit groan and screech before the cables snapped and the crane partially collapsed.
Before you walk off with the supervisors to inspect the damage one of the workers offers the opinion that this is an “imminent danger” situation. About 30 minutes later, you are meeting with the engineers and supervisors on one the overhead platforms continuing your inspection of the damage: when a supervisor comes up and tells you that he has heard that an hourly employee has just called OSHA and told them of the situation and that they used the term “imminent danger” in their conversation.
The Questions: What are your most important concerns? What should you do next? What information is the most critical for you to have right away? What directions would you give to the supervisors and engineers? When should you inform your facility manager and what should you tell him/her? Should you meet with the hourly employees and what will you discuss with them? How will you handle the OSHA inspector should one show up in the next few hours?

Instructions: For Scenario # 1 AND # 2, you are required to discuss a sequential Action Plan on your part that addresses all of the issues presented. It should be a minimum of about 500-600 words (that's about two pages when double spaced, 12 pt type, 1” margins) and must follow the APA formatting guidelines.

  • Share This:  
  •  Facebook
  •  Twitter
  •  Google+
  •  Stumble
  •  Digg
Email ThisBlogThis!Share to XShare to Facebook
Newer Post Older Post Home

0 comments:

Post a Comment

Click Here to Place order

Popular Posts

  • A “criminal minds” Aileen Wournos individual will be your “patient”
     A “criminal minds” Aileen Wournos individual will be your “patient”  A brief history of the patient including diagnoses (documented or your...
  • CEO Jane Lionel has some hard decisions to make with regard to some of the company’
     CEO Jane Lionel has some hard decisions to make with regard to some of the company’solder hands, and even on the eve of that decision, I be...
  • Problem in Supply Chain
    Problem in Supply Chain Problem 2. (Chapter 11: The Storage and Handling System) Compare the constrast private ownership of storage space to...

Recent Posts

Unordered List

Pages

  • Home

Text Widget

Blog Archive

  • November 2022 (20)
  • October 2022 (50)
  • September 2022 (119)
  • August 2022 (107)
  • February 2022 (501)
  • January 2022 (443)
  • December 2021 (488)
  • November 2021 (1574)
  • October 2021 (28)
  • September 2021 (11)
  • July 2021 (8)
  • June 2021 (15)
  • May 2021 (39)
  • April 2021 (15)
  • March 2021 (303)
  • February 2021 (712)
  • January 2021 (903)
  • December 2020 (2)
  • September 2020 (33)
  • April 2016 (5183)
  • March 2016 (3763)
  • February 2016 (4356)
  • January 2016 (1749)
  • December 2015 (22)
  • November 2015 (147)
  • October 2015 (23)

Sample Text

Copyright © STUDYSHIELDS ASSIGNMENT HELP | Powered by Blogger
Design by Hardeep Asrani | Blogger Theme by NewBloggerThemes.com | Distributed By Gooyaabi Templates