Project MANAGEMENT

 March 30, 2016     No comments   

Project MANAGEMENT

PART 1
There are many factors that can affect the project schedule. There are unforeseen conditions, such as finding poor soil. The procurement process can also have a major impact on the project schedule. Procurement includes lead-time items, such as contracting for the construction materials or having those materials brought to the construction site at the correct time. Furthermore, the lead-time items may cross a number of different disciplines. All of these lead-time items (and the personnel who use them) must be accounted for in the project schedule.
For this question, imagine that you are working for a construction management firm. The construction project is a steel post-and-beam structure. In your discussion response, detail the procurement process, from the time of being awarded the contract to having the steel on site for placement. In your response, please include a timetable for the duration of the procurement process and discuss the shop-drawing process.
PART II
Unforeseen conditions are a common occurrence for addition and remodeling projects. The architect and engineer complete as-built drawings by verifying the existing conditions. These as-built drawings are then used for the addition or remodeling project design. As the proposed drawings are completed and the construction has started there still may be problems that require attention.
Suppose that a remodeling project calls for the demolition of a wall. However, it turns out there is a roof drainpipe within the wall cavity that is selected for demolition. The roof drain is now located within an open area and requires the roof drain to be relocated. In your discussion response, answer the following questions:
•What are steps in the process to relocate the roof drain?
•What disciplines are required to assist in this relocation?
•Why didn’t the A/E firm locate the roof drain during the initial filed work?
•Who pays for the relocation?

Please post references in APA format

  • Share This:  
  •  Facebook
  •  Twitter
  •  Google+
  •  Stumble
  •  Digg
Email ThisBlogThis!Share to XShare to Facebook
Newer Post Older Post Home

0 comments:

Post a Comment

Click Here to Place order

Popular Posts

  • A “criminal minds” Aileen Wournos individual will be your “patient”
     A “criminal minds” Aileen Wournos individual will be your “patient”  A brief history of the patient including diagnoses (documented or your...
  • CEO Jane Lionel has some hard decisions to make with regard to some of the company’
     CEO Jane Lionel has some hard decisions to make with regard to some of the company’solder hands, and even on the eve of that decision, I be...
  • Problem in Supply Chain
    Problem in Supply Chain Problem 2. (Chapter 11: The Storage and Handling System) Compare the constrast private ownership of storage space to...

Recent Posts

Unordered List

Pages

  • Home

Text Widget

Blog Archive

  • November 2022 (20)
  • October 2022 (50)
  • September 2022 (119)
  • August 2022 (107)
  • February 2022 (501)
  • January 2022 (443)
  • December 2021 (488)
  • November 2021 (1574)
  • October 2021 (28)
  • September 2021 (11)
  • July 2021 (8)
  • June 2021 (15)
  • May 2021 (39)
  • April 2021 (15)
  • March 2021 (303)
  • February 2021 (712)
  • January 2021 (903)
  • December 2020 (2)
  • September 2020 (33)
  • April 2016 (5183)
  • March 2016 (3763)
  • February 2016 (4356)
  • January 2016 (1749)
  • December 2015 (22)
  • November 2015 (147)
  • October 2015 (23)

Sample Text

Copyright © STUDYSHIELDS ASSIGNMENT HELP | Powered by Blogger
Design by Hardeep Asrani | Blogger Theme by NewBloggerThemes.com | Distributed By Gooyaabi Templates