Prepare a master production schedule
Prepare a master production schedule (MPS) chart using the following information. Weekly Demand (weeks 1 thru 6): 810; 1350; 1100; 1000; 610; 1300. Minimum Lot Size = 2000; Safety Stock = 500; Beginning Inventory = 1000. Inv 1000 weeks 1 2 3 4 5 6 810 1350 1100 610 1300 Lot 2000 safety 500 need 200 min per week A college bookstore opens a booth and buys back used books during final exam week. From 9 to 12 in the morning students arrive at the rate of 40 per hour. The bookstore employee can service 50 students per hour. What is the average time in minutes that a student will be in the bookstore (system)? Project path A-C-E-J has these activity time estimates in days: Activity Optimistic Most Likely Pessimistic A 3 4 5 C 9 12 14 E 12 15 20 J 7 9 9 Compute the expected time or duration for each activity, the variance for each activity, and the expected duration and variance for the path. A pipe company sells plastic pipe to water companies. Historic demand for the past 40 weeks is shown below: Sales Weeks 5K – 10K 4 11K – 20K 12 21K – 30K 16 31K – 40K 8 If the company wanted to do a Monte Carlo simulation analysis, what would the random number assignments to the sales classes be? 4 classes 50 % distribution 89.3% in the 23---78 percentile What 7 steps should a company plan for in order to successfully convert to a JIT system? Two separate operations are required to complete a product. Use Johnson's rule to sequence the following six jobs using the given times. Job Operation 1 Operation 2 A 1.6 hrs. 1.9 hrs. B 1.3 1.1 C 1.5 1.7 D 1.6 1.4 E 1.5 1.2 F 2.0 1.6 Job sequenced 1.3 1.4total 1.2345 hrs a c b e d f Draw a Gantt chart that shows how the following five classes can be scheduled into two classrooms, A and B: Business Development from 9 AM to 11:45 AM;
0 comments:
Post a Comment